Kitchen Renovation in Oakville
One accountable team, a written itemised quote before any work starts, and a start date and finish date you get in writing.
You know what you want changed. Here is how the work actually runs.
Maybe the layout fights you every time you cook. Maybe the cabinets in your Old Oakville home are original to the house and the doors no longer close straight. Before a single thing comes off the wall, ArchCap walks the room with you and writes down the full scope: cabinets, counters, plumbing moves, electrical, flooring, and finish work. You get a written, itemised quote so you can see what each part costs and where your money goes.
From there you have one point of contact for the whole job. The same team that quotes your kitchen is the team that builds it, and you get the start date and the finish date in writing.
A real schedule, and a kitchen you can still half-live in
A kitchen renovation pulls apart the busiest room in the house. So we sequence the work to keep your home livable for as long as possible. Demolition, rough-in, inspection, then cabinets, counters, and finishing happen in an order you can follow. You will know which days are loud, which days need the water shut off, and when the counter template gets measured so the stone is cut to fit.
We protect what stays. Floors get covered, dust gets contained, and the site gets swept at the end of the day. If a surprise shows up behind the wall, like old wiring or a hidden leak in a Bronte bungalow, we stop, show you the problem, and price the fix before we carry on. Nothing gets added quietly at the end.
Built for how Oakville homes are actually put together
A new build off Glen Abbey and a century home near the lake are two different jobs. Newer kitchens often want an island, better lighting, and a pantry wall. Older homes ask for careful work around plaster, settled floors, and plumbing that was run decades ago. We measure for level and square before we order cabinets, because a counter that looks fine on paper can sit wrong on a floor that has moved.
If your plan touches the gas line, the main water supply, or a load-bearing wall, we tell you plainly and bring in the right trades. You get one team coordinating it all, so the plumber, the electrician, and the finish carpenter are working to the same schedule.
Clear pricing, and updates you do not have to chase
The number that worries most homeowners is the one that moves after the contract is signed. Your itemised quote lists materials and labour by section, so a change to the counter does not quietly drag the whole price up. Any change gets written down and approved by you before we order or build it.
You will hear from us during the job, not just at the start and the invoice. A short update on where things stand, what is happening next, and anything we need from you. Families in Joshua Creek and across Oakville hire us to renovate the kitchen once and be done with it. Call ArchCap at (289) 260-3971, or request a quote.
Licensed & insured
A fixed price, up front
One accountable team
24/7 emergency line
Client voices
What clients say
★★★★★
“Professional, on time, and very clear about costs.”
Mike T. · Google review
★★★★★
“They handled our full main floor renovation and kept us updated every step.”
Sarah L. · Google review
★★★★★
“Post-renovation cleanup was spotless, felt like a new home.”
David R. · Google review
Questions homeowners ask
How long does a kitchen renovation in Oakville take?
Most full kitchens run four to eight weeks on site, depending on the size and how much moves. Custom cabinets and stone counters have lead times, so part of the wait is ordering before any tools come out. We give you a start date and a finish date in writing, and we tell you early if a backordered material affects either one.
Can you give me a written quote before I commit?
Yes. We walk the kitchen with you, write down the full scope, and give you an itemised quote with materials and labour listed by section. You see what each part costs before you decide. The quote is free.
Will my price change partway through the job?
It only changes if you approve a change or if we find something hidden behind the wall, like old wiring or a leak. In either case we stop, show you the issue, and price it before we carry on. Nothing gets added to your invoice that you did not see and agree to first.
Can I use the kitchen at all during the renovation?
For part of it, no, since the sink, stove, and counters come out during the main work. We sequence the job to shorten that stretch and tell you ahead of time which days the water and power are off so you can plan around them.
Do you handle the plumbing and electrical, or do I hire those separately?
We coordinate the trades so you deal with one team, not three. The plumber, electrician, and carpenter work to the same schedule. If your plan moves the sink, the gas line, or a load-bearing wall, we tell you plainly and bring in the right people for it.
Do you renovate kitchens across all of Oakville?
Yes, from Old Oakville and Bronte near the lake to Glen Abbey and Joshua Creek. Older homes and newer builds are put together differently, so we measure for level and square in your specific home before ordering cabinets or counters.
Do you handle design and permits?
Yes. We handle design, drawings and the permits your project needs, so you are not managing separate people for each step.
Will I get a fixed price before work starts?
You get a written, itemised quote before any work begins, with materials, labour and scope laid out, so there are no surprises at the end.
How long will a renovation take?
It depends on the scope, but we give you a realistic schedule with the quote and keep you posted as the work moves.
Do you clean up after the work?
We hand the space back done and clean, and our own cleaning crews can take it further if you want.
Tell us about your project.
Tell us what you are planning, and we’ll come back with a clear next step and an itemised price.